Ware State Prison fire-exit inspection: the September 24, 2026 follow-up report
The State Fire Marshal's third inspection of Ware State Prison's fire exits, on September 24, 2026, three months after the first. The warden and GDC's fire chief told the inspector that nothing had been changed on the doors and the barrel bolts had not been removed. Warden James C. Spann said any plan of correction would come from GDC's facilities department. The report again rates the prison Non-Compliant on means of egress, with findings that it says reflect the two earlier inspections. The first two inspections are in request S000148-090126.
Status: OCI released the September 24 report on September 30, 2026. It has not released a GDC plan of correction, scheduling records, or plan-review submissions for replacement locks (items 2 and 3).
Documents as released (1)
| Document | Received | File |
|---|---|---|
| Inspection report, September 24, 2026 follow-up (Follow-Up #2, permit INS26-003833) Signed September 24, 2026. Means of egress Non-Compliant. Records the warden and fire chief saying nothing had been changed on the doors and the barrel bolts had not been removed. A further follow-up was scheduled for about 30 days later. | September 30, 2026 | PDF, 2 p., 34 KB |
What we asked for
Sent through: OCI open-records portal (GovQA)
What happened
| September 21, 2026 | Added to request S000148-090126 at GPS's request after the August report said another follow-up would come in about 30 days; OCI opened it as S000160-092126. |
| September 30, 2026 | OCI released the Follow-Up #2 inspection report (File 26-009306, permit INS26-003833). |
Cost
$0.00: No fee charged
Machine-readable
- JSON: https://gps.press/records/s000160-092126/?format=json
- Markdown: https://gps.press/records/s000160-092126.md
- REST API: https://gps.press/wp-json/gps-public-records/v1/requests/S000160-092126